The Quality Control area focuses on PMI (Positive Material Identification) testing.
PMI requirements are set at the master material level and drive which received materials appear in Ready For Testing.
5.7.1 PMI Percent Setter
5.7.2 Ready For Testing
5.7.3 View PMI Request & Material PMI Testing